Gas, Oil, Dual Fuel Hot Water Boiler with European Burner

Products

Gas, Oil, Dual Fuel Hot Water Boiler with European Burner

Gas, Oil, Dual Fuel Hot Water Boiler with European Burner

Boiler Applications -Providing hot water for heating through radiators and heat exchangers, especially suitable for use

Send your inquiry

DESCRIPTION

Basic Info
Model NO. CWNS0.35~2.8
Drum Placement Horizontal Boiler
Pressure No Pressure
Manufacturing Level A
Burning Style Chamber Combustion Boiler
Usage Industrial, Commercial
Rated Working Ressure No Pressure (Atmospheric Pressure)
Electricity Specification 3/380/50, 3/400/60, 3/440/60, 3/220/60
Boiler Type Shell Type
Design 3 Pass, Fire Tube
Insulation Material Bi Constitutent Material (Patent)
Thickness of Insulation 100mm
Transport Package Stretch Film & Wooden Cases
Specification 0.35MW ~2.8MW
Trademark Devotion
Origin Guangzhou
HS Code 84031090
Production Capacity 100 Sets/Month
Product Description
Boiler Applications

-Providing hot water for heating through radiators and heat exchangers, especially suitable for use in hotels, residential areas, hospitals, schools, banks and so on. The outlet water temperature is 90 degrees C;-Providing hot water for central air conditioning heating system with water-water heat exchangers.

 

Main Details (two colors, one is red, another one is black & blue)

Gas, Oil, Dual Fuel Hot Water Boiler with European Burner

Gas, Oil, Dual Fuel Hot Water Boiler with European Burner

High Efficiency Design Excellent Welding Quality

- horizontal 3 psss structure. -beautiful welding done by welding robots
- Corrugated furnace,bigger heating surface -hydraulic testing to guarantee welding quality
- big combustion room design
-compact design, less installation area requirement
-easy accessible for maintenance

Gas, Oil, Dual Fuel Hot Water Boiler with European Burner

Gas, Oil, Dual Fuel Hot Water Boiler with European Burner

 

Good Finishing Control Panel & Burner
-good quality insulation materials -fully automatic European brand burner -withstanding high temperature paint -separate & flexible floor standing control panel
-easily assemble metal sheet & case -control panel with full safety protections like water
-long life-span level, hot water temperature, flue gas temperature

Our facilities

Gas, Oil, Dual Fuel Hot Water Boiler with European Burner

 


FRQ
Q1: Where is your company?A1: We are located in Guangzhou which is famous for international business and worldwide renowned Canton fair is held twice a year, it's the nearer and less cost to reach ports of Southeast Asia, Africa, Middle East, South America, Oceania and Europe.Q2: What is the Warranty for the boilers?A2: You will get eighteen months (18) warranty counting from the date of shipment or fourteen (14) months from the date of commissioning, whichever is earlier. Q3: How about the installation and commissioning?A3: We'll specify the service clause for installation and commissioning in details. Generally, our products can be handled by end-users themselves with our documents provided or online assistance. However, our service team members also are available for travelling upon request from customers. Q4: What's the production lead time for delivery?A4: For our standard products, usually it will take about 35-45 days for pressure boilers, and 25-30 days for atmospheric-pressure boilers. For non-standard products, time will be different and subject to the specifications of pressure, electricity, fuel, capacity, etc. Q5: What about your payment term?A5: Our terms of payment is very flexible, we can discuss and meet your requirement. However, TT is the most welcome term and it has the priority to the price discount. Q6: What kind of documents will be provided?A6: Our documents include English instruction manuals, conformity certificate, drawings, manufacturing data, etc. More detailed documents can be provided upon request. Q7: What's your MOQ?A7: Only 1 set, if you have more than that, you will get a more favorable price. Q8: How's the packaging & shippingA8: For metal products like boiler body, steam header, tank, etc, they will be packed by stretch film; for accessories, they will be packed in wooden cases or carton boxes. We can handle all shipments including standard container, open top container, flat container, bulk carrier, etc. Because of big dimensions, not all boilers can be loaded into standard containers. For gas/oil boilers, bigger than 5 ton/hr or 3.5 MW can't be loaded into standard container. Frame rack (flat) container or bulk carrier will be applied.